A+ A A- Skip to main content

Asian Paints

2674.74.70

Cipla

1429.5-8.50

Eicher Motors

7418.514.00

Nestle India

1423.5-0.90

Grasim Inds

3072.9-13.20

Hindalco Inds.

959.33.50

Hind. Unilever

2098.4-4.20

ITC

279.352.70

Trent

2860.2-7.50

Larsen & Toubro

3775.6-8.30

M & M

3117.834.90

Reliance Industries

1296.61.10

Tata Consumer

1088.53.00

Tata Motors PVeh

331.8-1.20

Tata Steel

185.490.23

Wipro

177.743.09

Apollo Hospitals

8888-46.00

Dr Reddy's Labs

1224.4-5.10

Titan Company

4625.846.40

SBI

1031.21.10

Shriram Finance

1024.4-9.40

Bharat Electron

407.1-3.85

Kotak Mah. Bank

377.15-1.25

Infosys

1082.46.10

Bajaj Finance

1037.616.30

Adani Enterp.

3151.40.80

Sun Pharma.Inds.

1950.1-1.40

JSW Steel

1221-5.90

HDFC Bank

808.3-7.15

TCS

220111.80

ICICI Bank

1418.22.00

Power Grid Corpn

280.750.05

Maruti Suzuki

13783200.00

Axis Bank

1307.6-4.70

HCL Technologies

1187.419.40

O N G C

246.75-0.43

NTPC

342.45-1.90

Coal India

427.35-0.20

Bharti Airtel

1921.83.50

Tech Mahindra

1510.311.60

Jio Financial

235.65-0.94

Adani Ports

1826.4-2.70

HDFC Life Insur.

567.6-1.15

SBI Life Insuran

1822.1-44.30

Max Healthcare

1098.2-4.50

UltraTech Cem.

11771-41.00

Bajaj Auto

10331.58.50

Bajaj Finserv

1838.6-11.00

Interglobe Aviat

5265.594.50

Eternal

286.45-8.35

Corporate News - Detailed News Back
Waaree Energy Storage Solutions commences BESS container manufacturing unit
16-Jul-26   19:18 Hrs IST

Waaree Energy Storage Solutions (Waaree ESS), a subsidiary of Waaree Energies, today announced the commencement of its Battery Energy Storage System (BESS) Container Manufacturing Facility.

This BESS Container Manufacturing facility is of 5.15 GWh - uprated from an originally planned 3.5 GWh, driven by debottlenecking of production throughput and improved energy density of battery cells. The facility is equipped with advanced Industry 4.0 technologies, Automated Guided Vehicles (AGVs), intelligent material handling, automated assembly lines, and advanced testing and quality assurance systems. 

The BESS container facility is the first milestone in Waaree ESS's manufacturing roadmap of 20 GWh. In the current financial year, the company intends to operationalize below facilities:

  • 5.15 GWh of Battery Pack Manufacturing -uprated from an originally planned 3.5 GWh, driven by debottlenecking of production throughput and improved energy density of battery cells
  • 3.5 GWh of Lithium Cell Manufacturing

DJIA 52663.96
134.69 0.26%
S&P 500 7591.19
26.60 0.35%
HANG SENG 25008.61
327.50 1.33%
NIKKEI 225 66873.37
-1878.14 -2.73%
FTSE 100 10555.24
39.32 0.37%
NIFTY 24072.75
-5.75 -0.02%
×
Ask Your Question
close
refresh