A+ A A- Skip to main content

Asian Paints

2723.6 -31.40

Cipla

1352.5 -3.00

Eicher Motors

7601 0.00

Nestle India

1408.8 8.40

Grasim Inds

3141.5 -3.60

Hindalco Inds.

1012 3.50

Hind. Unilever

2188.3 -30.20

ITC

290 -1.15

Trent

3181.5 1.80

Larsen & Toubro

4198.7 8.70

M & M

3087.1 -49.40

Reliance Industries

1316.8 -11.30

Tata Consumer

1109.3 -2.10

Tata Motors PVeh

360.2 -4.45

Tata Steel

198.86 -1.66

Wipro

179.23 -3.61

Apollo Hospitals

8443.5 32.00

Dr Reddy's Labs

1265.9 -1.60

Titan Company

4382.4 -5.50

SBI

1036 -6.70

Shriram Finance

1001.65 -1.05

Bharat Electron

427.75 -0.85

Kotak Mah. Bank

400.4 -2.55

Infosys

1042.3 -85.20

Bajaj Finance

964.3 5.45

Adani Enterp.

3034.5 21.10

Sun Pharma.Inds.

1826 1.20

JSW Steel

1289.9 -4.00

HDFC Bank

779.85 -19.15

TCS

2097.6 -105.70

ICICI Bank

1349.3 7.00

Power Grid Corpn

291.8 3.10

Maruti Suzuki

13432 -52.00

Axis Bank

1358.7 -1.40

HCL Technologies

1120 -41.80

O N G C

245.55 0.25

NTPC

365.25 3.30

Coal India

449.3 -2.70

Bharti Airtel

1901.6 26.80

Tech Mahindra

1392.1 -55.60

Jio Financial

244.28 0.18

Adani Ports

1841.8 -0.30

HDFC Life Insur.

589.8 -1.50

SBI Life Insuran

1796.4 -11.20

Max Healthcare

1084.9 -5.55

UltraTech Cem.

11347 -83.00

Bajaj Auto

10033 -44.00

Bajaj Finserv

1770.5 -1.20

Interglobe Aviat

5009.1 -2.70

Eternal

261.4 2.85

Corporate News - Detailed News Back
Tata Power receives LoI for Ryapte Power Transmission project
19-Jun-26   12:04 Hrs IST
Tata Power Company has received a Letter of Intent (LOI) from REC Power Development and Consultancy, a wholly owned subsidiary of REC, for the acquisition of Ryapte Power Transmission, a project special purpose vehicle (SPV).

The Project SPV, Ryapte Power Transmission, will be developed on a Build-Own-Operate Transfer basis to provide transmission services for 35 years from the Scheduled Commercial Operation Date (SCOD), set 30 months after the SPV transfer.

The scope of project involves constructing approx. 250 km line route comprising 400 kV D/C line, 220 kV D/C line and 220 kV Underground cable in the following region:

i 400 kV D/C line from Ryapte AIS Sub station to proposed 400/220 kV Doddathaggalli GIS S/s,
ii 400 kC D/C line from existing Kolar S/s to proposed Doddathaggalli GIS S/s
iii 220 kV D/C line from proposed Doddathaggalli GIS S/s to 220 kV existing substation of Ekarajapura, Hosakote and Sarjapura in Karnataka.
iv 220 kV Underground cable from Doddathaggalli GIS S/s to Ekarajapura, Hosakote and Sarjapura s/s.

In addition, the project scope includes
(a) Establishing 5x500 MVA, 400/220 kV S/s at Ryapte in Tumkur District along with 2x125MVAr 400 kV Bus Reactors and
(b) Establishing 3X500 MVA, 400/220kV GIS sub-station at Doddathaggalli (Near Hosakote) along with 2x125 MVA, 400 kV Bus Reactors


DJIA 51584.84
71.29 0.14%
S&P 500 7519.91
78.81 1.06%
HANG SENG 23924.82
-387.35 -1.59%
NIKKEI 225 70971.12
-82.37 -0.12%
FTSE 100 10394.87
-113.74 -1.08%
NIFTY 23979.55
-188.45 -0.78%
×
Ask Your Question
close
refresh