Asian Paints

2196.8 -24.40

Cipla

1314.7 -9.60

Eicher Motors

6741 -234.50

Nestle India

1202.2 -18.60

Grasim Inds

2568.6 -104.50

Hindalco Inds.

910.05 -59.70

Hind. Unilever

2160 23.10

ITC

301.45 -2.65

Trent

3487.8 -45.80

Larsen & Toubro

3439 -280.50

M & M

2931.1 -100.10

Reliance Industries

1380.7 -11.50

Tata Consumer

1083.6 25.80

Tata Motors PVeh

314.1 -10.45

Tata Steel

183.51 -9.96

Wipro

197.58 -4.93

Apollo Hospitals

7550 -24.50

Dr Reddy's Labs

1292.3 -26.70

Titan Company

4073.2 -56.40

SBI

1047 -38.20

Shriram Finance

1003.6 -28.10

Bharat Electron

439.4 -14.15

Kotak Mah. Bank

366.85 -8.45

Infosys

1248.3 -17.50

Bajaj Finance

855.05 -8.05

Adani Enterp.

1961.1 -40.90

Sun Pharma.Inds.

1801.6 -23.70

JSW Steel

1119.3 -53.30

HDFC Bank

817 -15.75

TCS

2410.5 -31.90

ICICI Bank

1254.8 -11.70

Power Grid Corpn

300.95 -2.65

Maruti Suzuki

12591 -420.00

Axis Bank

1197.3 -37.20

HCL Technologies

1325.4 -32.70

O N G C

264.1 -6.45

NTPC

384.45 -6.10

Coal India

467 -3.10

Bharti Airtel

1803.4 2.10

Tech Mahindra

1332.8 -17.00

Jio Financial

235.25 -6.95

Adani Ports

1363.2 -28.30

HDFC Life Insur.

625.75 -19.95

SBI Life Insuran

1904.4 -35.00

Max Healthcare

990 -30.40

UltraTech Cem.

10616 -473.00

Bajaj Auto

8875 -287.00

Bajaj Finserv

1738 -32.80

Interglobe Aviat

4158.2 -93.50

Eternal

215.68 -5.49

Corporate News - Detailed News Back
Oil India inaugurates Numaligarh-Siliguri product pipeline capacity augmentation project
13-Mar-26   19:25 Hrs IST

Oil India has inaugurated the capacity augmentation project of the Numaligarh-Siliguri Product Pipeline (NSPL).

The Numaligarh-Siliguri Product Pipeline (NSPL) is a 654-km long, 406 mm (16-inch) diameter cross country multi-product pipeline which was originally designed and operated for a capacity of 1.72 Million Metric Tonnes Per Annum (MMTPA), the pipeline has now been upgraded to 5.5 MMTPA to support the expansion of Numaligarh Refinery from 3.0 MMTPA to 9.0 MMTPA under the Government of India's Hydrocarbon Vision 2030 for the North-East.

The capacity enhancement has been achieved through upgradation of existing infrastructure, including conversion of pigging stations at Sekoni, Guwahati, Bongaigaon and Madarihat into Intermediate Pumping Stations, augmentation of pumping facilities at Numaligarh Dispatch Terminal and Upgradation of facilities at Siliguri Receipt Terminal for enhanced operational efficiency and safety.

Implemented as a brownfield project, the augmentation has been completed within approximately Rs 750 crore against the approved cost of Rs 860 crore, achieving substantial savings while optimizing the utilization of existing assets. During the execution phase, the project generated significant employment, with around 4.1-million-man hours over a period exceeding three years across Assam and West Bengal.

The project represents a major milestone in strengthening petroleum product transportation infrastructure in the North-Eastern region and enhancing India's energy security.

Powered by Capital Market - Live News


DJIA 46702.98
-735.30 -1.55%
S&P 500 6694.68
-102.12 -1.50%
HANG SENG 25465.61
-251.16 -0.98%
NIKKEI 225 53838.16
-614.80 -1.13%
FTSE 100 10249.42
-55.73 -0.54%
NIFTY 23151.10
-488.05 -2.06%
×
Ask Your Question
close
refresh