Asian Paints

2510.8 -12.70

Cipla

1501.3 -38.80

Eicher Motors

7007 118.00

Nestle India

1271.6 -8.30

Grasim Inds

2891.7 -58.70

Hindalco Inds.

847.85 -13.50

Hind. Unilever

2465.5 -4.10

ITC

420.35 1.60

Trent

4694.3 -50.20

Larsen & Toubro

4030.9 43.40

M & M

3487.2 -14.90

Reliance Industr

1486.4 -2.10

Tata Consumer

1165 -11.60

Tata Motors PVeh

410 -2.45

Tata Steel

182.84 -1.51

Wipro

240.67 -1.25

Apollo Hospitals

7681 -109.00

Dr Reddy's Labs

1197.6 -4.60

Titan Company

3746.7 -4.00

SBI

937 2.65

Shriram Finance

748.9 10.65

Bharat Electron

426.1 16.20

Kotak Mah. Bank

2102.2 -35.00

Infosys

1482.3 -11.50

Bajaj Finance

1042.8 -9.50

Adani Enterp.

2481 -45.90

Sun Pharma.Inds.

1690.7 -12.70

JSW Steel

1206 -4.00

HDFC Bank

987.3 -10.85

TCS

3058 22.70

ICICI Bank

1345.3 -17.10

Power Grid Corpn

288.15 -3.35

Maruti Suzuki

16186 -20.00

Axis Bank

1232.8 -5.80

HCL Technologies

1541.5 -8.30

O N G C

255.37 0.84

NTPC

336.95 -8.20

Coal India

388.65 0.95

Bharti Airtel

2054.5 -11.80

Tech Mahindra

1424.4 -9.40

Adani Ports

1451.5 -6.40

HDFC Life Insur.

731.85 -14.75

SBI Life Insuran

1955.7 -12.70

Max Healthcare

1147.8 -30.70

UltraTech Cem.

11947 -106.00

Bajaj Auto

8892.5 -30.50

Bajaj Finserv

2088.3 -26.30

Interglobe Aviat

5625 -100.00

Eternal Ltd

317.75 -11.60

Corporate News - Detailed News Back
NTPC adds commercial capacity of 50 MW of Nokhra Solar PV Project
01-Apr-23   17:22 Hrs IST
NTPC announced that consequent upon successful commissioning, fourth part capacity of 50 MW out of 300 MW Nokhra Solar PV Projectof NTPC Green Energy (a wholly owned Subsidiary of NTPC ) at Bikaner, Rajasthan, is declared on Commercial Operation w.e.f. 00:00 Hrs. of 01 April 2023.

The first part capacity of 100 MW has already been declared on commercial operation w.e.f. 20 December 2022, second part capacity of 50 MW w.e.f. 30 December 2022 and third part capacity of 50 MW w.e.f. 16 February 2023. The total capacity declared on commercial operation of Nokhra Solar PV Project is now 250 MW.

With this, installed and commercial capacity of NTPC Green Energy has become 2661 MW while group installed and commercial capacity of NTPC has become 71644 MW.

Powered by Capital Market - Live News


DJIA 47580.95
37.83 0.08%
S&P 500 6861.23
17.89 0.26%
HANG SENG 25906.65
-376.05 -1.43%
NIKKEI 225 52282.77
957.16 1.86%
FTSE 100 9715.58
-44.48 -0.46%
NIFTY 25722.10
-155.75 -0.60%
×
Ask Your Question
close
refresh