Asian Paints

2772.6 20.60

Cipla

1511.6 10.70

Eicher Motors

7334.5 -13.50

Nestle India

1279.7 -15.30

Grasim Inds

2856.4 4.70

Hindalco Inds.

925.7 30.75

Hind. Unilever

2348 25.00

ITC

350.05 -13.80

Trent

4409.6 112.20

Larsen & Toubro

4163.4 23.00

M & M

3802.4 41.40

Reliance Industr

1592.3 16.70

Tata Consumer

1170.7 -6.20

Tata Motors PVeh

370.35 2.80

Tata Steel

182.88 0.99

Wipro

269 1.65

Apollo Hospitals

7129.5 18.00

Dr Reddy's Labs

1256.1 2.70

Titan Company

4051.7 2.40

SBI

998.95 14.20

Shriram Finance

1010.35 -9.35

Bharat Electron

403.15 5.45

Kotak Mah. Bank

2195.1 -22.70

Infosys

1640.4 10.60

Bajaj Finance

990.45 17.35

Adani Enterp.

2279.8 19.80

Sun Pharma.Inds.

1728 6.90

JSW Steel

1180.7 9.20

HDFC Bank

1001.6 10.45

TCS

3250.7 23.30

ICICI Bank

1355.4 17.40

Power Grid Corpn

270.95 4.15

Maruti Suzuki

16960 252.00

Axis Bank

1266.9 -7.50

HCL Technologies

1640.2 5.70

O N G C

241.46 3.52

NTPC

352.1 15.80

Coal India

427.9 27.45

Bharti Airtel

2106.3 -4.10

Tech Mahindra

1612 4.30

Jio Financial

301.7 6.00

Adani Ports

1489.5 8.40

HDFC Life Insur.

754.85 4.75

SBI Life Insuran

2067.4 27.00

Max Healthcare

1062.6 13.20

UltraTech Cem.

11899 -2.00

Bajaj Auto

9502.5 -55.50

Bajaj Finserv

2038.4 1.40

Interglobe Aviat

5106 -4.50

Eternal

284.15 0.35

Corporate News - Detailed News Back
KPI Green Energy commences power supply from 92.15 MWp IPP Hybrid Power Project
02-Jan-26   18:44 Hrs IST
KPI Green Energy announced that its 92.15 MWp IPP Hybrid Power Project, awarded by Gujarat Urja Vikas Nigam (GUVNL) under the competitive bidding process for hybrid renewable energy projects, has commenced power generation and supply to the state grid.

The project, with GUVNL as offtaker, has an aggregate contracted capacity of 92.15 MWp, comprising 16.95 MW of wind power capacity and 75.2 MWp solar power capacity. The project has achieved grid synchronization, and power injection into the grid has commenced, well ahead of the scheduled project completion timeline of July 2026, reflecting the Company's strong execution capabilities and integrated project development expertise.

With the start of power generation, the project is expected to begin contributing to the Company's revenue on a sustained basis, in accordance with the long-term Power Purchase Agreement executed with GUVNL. The long-term contracted nature of the project is expected to provide stable and predictable cash flows, thereby strengthening the Company's overall renewable energy portfolio.

Powered by Capital Market - Live News


DJIA 48084.29
-303.78 -0.63%
S&P 500 6866.50
-50.74 -0.73%
HANG SENG 25854.61
219.37 0.86%
NIKKEI 225 50384.39
-142.53 -0.28%
FTSE 100 9967.75
36.37 0.37%
NIFTY 26328.55
182.00 0.70%
×
Ask Your Question
close
refresh